POLAVARAM FEET TOWARDS WATERWAYS

 

 Rajahmundry, April 21, (globelmedianews.com):
Polavaram project is going to be crucial for water consolidation, water supply and water conservation. The waterways base has been designed in connection with Polavaram water transport. The cargo boats will be upgraded to 157 km from the Wazirabad-Vijayawada Prakasam Barrage to Nallagonda District, up to 171 km from Dhawaleshwar to Bhadrachalam. In the Guntur and Nalgonda districts, hydrocarbons are provided with a wide range of cement, limestone, tobacco, chilli and cotton products as well as coal and cotton products in NewGuide and Manuguru areas, Tamil Nadu, Karnataka and Kerala. . The Polavaram canals are designed to serve the fourth water transport route being set up by the central government. In the Polavaram project, ports, the capital Amravati and the rivers of the rivers will also meet, thus polaravaram is going to be crucial to multi-purpose transportation.


POLAVARAM FEET TOWARDS WATERWAYS

 The Godavari River is currently used as a paved way for transporting goods from Rajamahendravaram to Bhadrachalam in the Godavari river. However, the Polavaram reservoir is set up to create a separate route rather than interrupted. The reservoir is located on the left and bottom of the reservoir for the transportation of the reservoir to the left of the reservoir on the left hand side at the Purushottapatnam village near Devipatnam in East Godavari district. It will be connected to Bhadrachari from the Kakinada in the future to the Fourth National Water Transport route to Puducherry. The Kakinada-Puducherry water transport area is part of this project. This is the continuation of Buckingham Calva depth and width enhancement scheme. The central government's objective is to provide handloom to domestic and foreign multinational companies. Of the 75 TMCs stored in the Polavaram reservoir in all time 60 TMCs are stored for agricultural purposes while the remaining 17 TMCs are being used in the Kakinada-Tada corridor to provide water for various domestic companies. The project is designed to plywood the right and left main stream with a water transport project designed by ports, rivers, and the capital. Another important water transport through polavaram massive calculus is to provide coal deposits in the Godavari valley for industrial enterprises in Chennai and Puducherry. The oil in the KG Basin is easily transported. Polavaram to Bhadrachalam, Polavaram to Amravati, from there to Chennai, Puducherry, and Visakhapatnam in accordance with water transportation to the right and left arcades. The connectivity of this call will be combined with various ports in the state, along with Kakinada and Gangavaram ports. Coal, steel, cement and limestone are exported to southern states. Waterways Authority designs the transportation of steel products from fish and shrimp in Vizhinagar district as well as in Vishakhapatnam districts.

No comments:
Write comments